§ 4-26. General requirements for new construction projects.  


Latest version.
  • All new construction projects located within the jurisdiction for the city shall comply with the following:

    (1)

    Temporary toilet facilities. All temporary toilet facilities shall be located on the property they serve and not on public street rights-of-way. The facility will be installed on the property as follows:

    a.

    With the door facing away from the public street or if a corner lot, at a forty-five (45) degree angle;

    b.

    Away from the construction access point; and

    c.

    Enclosed on three (3) sides by lattice secured to twelve (12) foot 4 × 4 post installed a minimum of three (3) feet in the ground.

(Res. No. 2008-08, § 2, 3-4-08)